Major Features:
John E. Green Company handled all mechanical piping, HVAC ductwork, controls, and insulation. A summary of our work:
- Full temporary heating and cooling for construction over the course of the project
- Radiant cooled floor with 6.5 miles of hydronic tubing
- Installed over 1,000 pieces of mechanical equipment
- 164,000+ UA manhours worked
- Largest air conditioning/cooling retrofit of a historical building to date (previously was the White House)